A Way of Life Since 1963

"Building on Your Ideas' for Over 57 Years

Wilton Mercury Sales Ltd.
New Ford Dealership Minnedosa, Mb.

 

ACC Concrete Work

- Concrete work for the ACC Culinary Art Addition
- Client: A Akman & Son Ltd.
- Location: Brandon, MB

 

Advantage Auto Sales

- Design and construction of Engineered Post Frame Building

 

Advantage Auto Sales

- Design and construction of Engineered Post Frame Building
- Client: Advantage Trailer Sales
- Hwy #1, Brandon,Manitoba

 

Advantage Auto Sales

Advantage Auto Sales
- Design and construction of Engineered Post Frame Building

 

Boyd Farm's and Trucking - Serivce Building

New 5,000sq/ft Service Facility for Boyd Farms located north of Minnedosa Mb. Steelway Pre-engineered Structure c/w artic pack insulation and liner package and in floor heat. Dual use building Farm and Commercial Trucking..

 

Brandon Hills United Church

A new church to replace one destroyed by fire, using a 30' x 52' laminated post frame building.
Client: Brandon Hills United Church
Location: Brandon Hills, South of Brandon, Manitoba

 

Brandon Research Station

Construction of greenhouse facility
- Client: Agriculture Canada
- Brandon, Manitoba

 

Brandon Riverbank Discovery Centre southside

14,000 sq/ft Brandon Tourism and Ducks Unlimited Office Complex for the City of Brandon

 

Brandon Riverbank Discovery Centre northside

14,000 sq/ft Brandon Tourism and Ducks Unlimited Office Complex for the City of Brandon

Brenda Lee Apartments

- 10,000 sq ft foundation repairs and interior and exterior renovation
- Client: 224630 Manitoba Ltd.
- 307 Louise Ave, Brandon, Manitoba

 

BRHC Nurses Residence Exterior Cladding

Client: Brandon Regional Health Authority

 

BRHC Nurses Residence Exterior Cladding Complete

Remove exterior brick veneer
Install New Torch on AVB
4 inch Rigid SM insulation
New exterior Cladding


CFB POL Storage

- Construction of a storage facility consisting of five subprojects, including storage vaults, waste oil storage and propane storage
- Client: Defense Construction Canada
- Location: CFB Shilo, Manitoba

 

CFHA Shilo Housing Rejuvenation

- A complete upgrade and renovation to 25 housing units.
- Client: Canadian Force Housing Authority
- Location: Canadian Forces Base Shilo, Manitoba

 

CFHA Shilo Housing Rejuvenation

- Renovated Rear of PMQ, 2nd level addition

 

Child and Family Services

Child and Family Serivces - 800 McTavish Ave.
- Designed by MCM Architects in Brandon
- 10,000 sq/ft of Admin. and Office Space
- Structural Slab and Wood Frame Construction
- Stucco Exterior, Mod Bit Roof.

Correctional Inst & Court House

- Interior renovation to basement jail cells and adjoining area.
- Client: Manitoba Infrastructure and Transportation
- Location: Dauphin, Manitoba

 

Cross Lake RCMP Detachment

- Construction of police detachment
- 5,000sq/ft Office, Secure Detention and Gym
- Client: Royal Canadian Mounted Police
- Location: Cross Lake, Manitoba

Dinsdale Personal Care Home

- Addition of Elevator and Interior Renovation
- Client: The Salvation Army of Canada
- Location: 510 6th St, Brandon, Manitoba

Dock Replacement

- Remove and replace elevating dock.
- Client: Public Works and Government Services
- Location: Brandon Research Station, Brandon, Manitoba

 

Don's OK Tire

Design and Construct 3,200sq/ft Tire Repair Facility
Client: OK Tire
Location: 1625 Parker Blvd, Brandon, Manitoba

Elkhorn School Library Renovation

- Renovation to library and other nearby areas, including expanding library space, new millwork, flooring and wall finishes.
- Client: Fort La Bosse School Division
- Location: Elkhorn, Manitoba

 

Engineered Post Frame Shop Addition

50ft x 52ft x 20ft 1 in 12 roof slope
Engineered Post Frame
R-28 wall insulation and r-40 ceiling insulation Structure
16ft x 16ft R-16 Overhead Doors
In-floor Nautral Gas Boiler Heat
Auto Exhaust CO detector and Motorized damper intake.

 

Esterhazy BigWay Foods

Esterhazy BigWay Foods
UNDER CONSTRUCTION
8,686 sq/ft retail food store
R-28 wall insulation R-50 ceiling insulation
Engineered Post Frame Construction
79ft x 109ft x 18ft

 

Esterhazy BigWay Foods - Front Entry

Main Entry Canopy Stucco and Culture stone Design over Engineered Wood Frame. Open For Business

 

Esterhazy BigWay Foods - Interior Retail

Interior Retail Front Entry into Store

George Fitton School

- Roof Replacement
- Client: Brandon School Division
- Location: 1129 3rd St Brandon, Manitoba

King George Grooming Room

- Interior renovation to King George School to create a grooming room.
- Client: Brandon School Division
- Location: 535 Park St, Brandon, Manitoba

Magicuts

- Construction of a hair salon located within an existing department store, including all new wall and ceiling finishes, flooring, millwork, furniture, mechanical and electrical.
- Client: Magicuts
- Location: in Zellers, Brandon, Manitoba

 

Medical Transportation Coordinator Centre

- Construction of MTCC on the 8th floor of the Nurses Residence, including exterior cladding to top 3 floors of the building, addition to penthouse, new electrical / mechanical and all new interior finishes.
- Client: Manitoba Health and Regional Health Authorities of Manitoba
- Location: 150 McTavish Ave E, Nurses Residence, Brandon, MB

Minnedosa Library

- Addition to existing library
- Client: Minnedosa Regional Library Board
- 45 1st Ave SW, Minnedosa, Manitoba

 

Minnedosa Rest Stop

- Interior Renovation to an existing building, including new mechanical and electrical services, new windows, millwork and washroom accessories.
All interior surfaces repaired, including patching and paint, regrouting ceramic tile walls etc.
- Client: Manitoba Transportation and Government Services
- Location: Junction of Hwy #10 and Hwy #16, outside Minnedosa, Manitoba

 

Nissan Store Brandon Mb.

Re Image the Nissan Store to meet the New Image

Nuclear Medicine Renovation

- Interior Renovation to Nuclear Medicine and Bone Density areas of Brandon Regional Health Centre.
- Client: Brandon Regional Health Centre
- Location: 150 Mctavish Ave E, Brandon, Manitoba

 

PFRA Community Pastures

Construction of concrete pads at 5 community pastures in Westman
Client: PFRA

 

Portage Hospital CT Scan Unit

- Addition to accomodate a new CT Scanner Unit
- Client: Regional Health Authority - Central Manitoba Inc.
- Location: Portage Hospital, Portage La Prairie, Manitoba

 

Princess Auto Store

Princess Auto in 18th Street north Brandon, Mb.
- 14,000 sq/ft of retail floor space
- Design Built using a Pre-Engineered Steel Building

RBC Renovation

- Renovation to the interior of three floors of a Royal Bank of Canada
- Client: GovanBrown Ltd
- Location: RBC Main Branch, Saskatoon, Saskatchewan

 

Reston Handi-cap Ramp and Entry

New Handi-cap Ramp and Entry to the Reston Elementry Shool. Concrete Pile Foundation, Sloping concrete ramp, and galvanized Steel Rails. New Double Commercial Steel Door Entry c/w Handi-cap Activated door operators.

 

Rivers Collegiate Addition & Renovation

- Band Room Addition and Carpentry Shop Renovations
- Client: Rolling River School Division
- Location: Rivers, Manitoba

Rowhouse Exterior Retrofit

- Renovations to the exterior of 13 rowhouses, including windows and doors, canopies and siding.
- Client: Canadian Forces Housing Authority
- Location: CFB Shilo, Manitoba

 

Shoal Lake BigWay Foods

7,000 sq/ft retail food store
R-28 wall insulation R-40 ceiling insulation
Engineered Post Frame Construction
87ft x 88ft x 18ft

Sidewalk Replacement

- Remove and replace sidewalks and steps at 49 residential addresses
- Client: Canadian Forces Housing Authority
- Location: CFB Shilo, Manitoba

Sidewalk Replacement

- Remove and replace sidewalks.
- Client: Canada Post
- Location: 914 Douglas St, Brandon, Manitoba

 

Simplot Storage Building

Storage Building for Simplot Canada - New Storage Structure 42ft x 128ft x 14ft-6”. Large overhead door in each end wall. Building is designed for a high corrosive locations with Aluminum Cladding Walls and Roof

Souris School

- Installation of mechanical air handling units, ductwork and interior renovations
- Client: South West Horizon School Division
- Location: Souris, Manitoba

Souris School

- Interior Renovations
- Client: Southwest Horizon School Division
- Location: Souris, Manitoba

Souris School

- School Renovations
- Client: South West Horizon School Division
- Location: Souris, Manitoba

St. Laurent Aboriginal Head Start

- Addition of Day Care and Head Start facility to Recreation Centre
- Client: St Laurent Co-op Recreational Centre Inc.
- Location: St Laurent, Mantioba

 

Viking Motors

New GM 2000 Image Store
- New Showroom, Service Drive and Body Shop
- Renovated GM Facility to over 11,000 sq/ft
- Engineered Post Frame Construction
- Engineered truss to 80ft at 1/2 in 12 roof slope

 

Viking Motors in Arborg Mb.

Re Image the Store front to Meet GM's New image

 

Washroom and Shower Buildings

- Two new washroom and shower buildings
- Client: Public Works and Government Services
- Location: Wasagaming Campgrounds, Riding Mountain National Park, Manitoba

Home I Company Profile I Building Process I Contractor Login I Links I Employment I Contact Us